This project meant breaking into the vault to find a new (and of course satisfied) client!
The demolition of a modern day bank was quite the challenge. The project involved contiguous piling, and a major site excavation at the rear (while business still ran out the front).
The excavation depth provided them with a sub floor basement, including parking and two levels of shopping with an elevator. The main focus for this project was to complete everything in time for the opening date that the owners had locked in.
Everything was executed on a tight schedule, leaving the owners back behind their counter with time to spare.